Rabu, 26 Maret 2014

High Pressure & High Temperature (HPHT) - Yogyakarta

Offering Training

High Pressure & High Temperature (HPHT)

DESCRIPTION
    To give the professional drilling team the necessary understanding of the concerns and hazards of drilling HP/HT wells prior to spud-in. To present and to create an understanding of the agreed and improved procedures before drilling of a HP/HT well as laid out by the drilling contractor and the oil company.
The participant will be able to:
·         To create an environment where team members challenge existing HP/HT practices and procedures and suggest or develop new ones that will enhance operational performance and safety
·         Identify and eliminate activities that have the potential to increase drilling risks
·         Openly discuss issues that impact on operational performance
WHO SHOULD ATTEND
 Derrickman and higher positions,Drilling contractor and oil company management on-board and onshore and Subcontractor personnel.
SUMMARY OUTLINE
·         Drill the well on paper
·         Planning ahead
·         Procedures for the drilling operation and for well control procedures including lessons learnt and guidelines for HPHT wells
·         Introductions to the recognised well control methods (Drillers Method, Bullheading, stripping and volumetric well control etc.)
·         Introduction to signals on the surface caused by influx in the well
·         Capacities and procedures for the specific well
·         Gas handling on the surface
·         Combating hydrate formation problems in the choke manifold
·         Operational case exercises
·         Subcontractors’ duties and responsibilities
·         Subcontractor presentations
·         Oil company presentations
·         Oilfield terminology
·         Enhancing the team approach to meet the common goal
COURSE METHOD
Coordinator Team
v  Presentation
v  Discuss
v  Case Study
v  Evaluation
v  Simulation
Ir. Aris Buntoro, MSc.
Aris Buntoro an instructor, either public or in-house training, such as: Introduction to Materials in Oil Industry Knowledge, Basic Production Operation, Drilling Materials, Introduction to Petroleum Engineering, Basic Drilling Engineering, Directional & Horizontal Drilling Technology and Its Aplications, Mud Design and Problem Solving, Electrical Submersible Pump, Well completions - Workover and Well Stimulation, and other topics that fit the needs of the user.
TIME & VENUE
COURSE FEE
Hotel Dafam Fortuna
Malioboro
Yogyakarta
2 – 3 April 2014
2 – 3  June 2014
6 – 7  October 2014
17 - 18 December 2014
2 days
08 am – 04 pm

IDR 7.000.000,- Per participant non residential at Yogyakarta
Disc 10% untuk 3 orang pendaftaran dari perusahaan yang sama.
Course fees can be transferred to the following account number :
CV JP CONSULTANT : MANDIRI Bank Yogyakarta Branch Acc. No.  1370007857077

FACILITY
INFORMATION AND REGISTRATION
¨  Module / Handout
¨  Certificate
¨  Souvenir
¨  Training Kit
¨  USB
JP Consultant
Kalibayem No. 436 Ngestiharjo Kasihan Bantul Yogyakarta
Phone        :  02743326339
Email        :jpconsultantyogyakarta@gmail.com
Web          : www.jptrainingcenter.com
Contact     : Tina     (085741853818)
                                (082225972336)
                   

Tidak ada komentar:

Posting Komentar